Ready-made checklist

Preparing for a home renovation

What to decide and document before the work starts: scope, layout and appliances, contract, records, neighbours and waste. The list adapts to the scale of the job.

Items inside: 19
View the checklist

Download a text file for your notes, or open the list in your installed Unload app and confirm the import.

The list adapts to you

Answer the questions and only the items you need stay on the list. Your answers carry over to the app and the file.

  • What does the work involve?

Your checklist

Work through the list in order. Hide the notes when you know what to do.

  1. Write down the scope of work, room by room

    What gets done, what stays untouched, what is postponed. Without this the budget grows with every conversation and the end is never in sight.

    Written boundaries are the only thing separating a renovation with an end date from a building site that runs for years.

  2. Approve the furniture and appliance layout

    Sockets, switches, water outlets and connection heights all depend on where the bed, sofa and fridge will stand. Deciding after plastering is too late.

  3. Choose the large appliances with exact dimensions

    Built-in appliances define recesses to the millimetre. A list of models with dimensions and connection types is for the builders, not for you.

    A recess built \u201croughly\u201d ends with buying a different appliance: adjusting always costs more than measuring first.

  4. Check whether structural changes need approval Structural changes or removing walls

    Removing or moving walls, relocating wet areas and touching shared building systems are regulated almost everywhere. Check the rules before the work, not after.

  5. Prepare a costed budget and set aside a contingency

    Opened walls and floors almost always bring surprises. Keep the reserve separate and do not spend it on upgrades along the way.

  6. Choose the contractors and agree the order of work

    Look beyond price: timescales, what is included, who buys materials and how stages are signed off. Ask about comparable jobs they have done.

  7. Sign a contract with the schedule, timeline and staged payments

    Paying everything upfront removes your leverage. Staged payments tie money to results rather than to promises.

  8. Break the work into stages with sign-off for each

    A stage that slips is visible at once; a single end date lies to you until the final week. Schedule sign-off before the next stage starts.

  9. Photograph the flat before the work starts

    Wide shots of every room, the state of windows, doors, pipes and appliances. This is the basis for any later conversation about what was already there.

  10. Learn the building rules and warn the neighbours

    Hours for noisy work, the lift, waste removal. A warned neighbour tolerates a drill far better than a woken one.

  11. Arrange construction waste removal

    Almost nowhere can it go in ordinary bins. Agree in advance who takes it away, where and at whose cost.

  12. Move out or protect furniture, windows and doors

    Construction dust gets everywhere and damages appliances. Move out what you can and cover the rest properly, not just on top.

  13. Decide where you will live during the work

    Living in the flat while it is renovated means a different schedule and a different price. Decide now, not when the water goes off.

  14. Agree in advance about water and power shutdowns

    Shutdowns are planned, not accidental. Check who arranges them, how long they last and how the neighbours are told.

  15. Buy materials with a margin and plan where to store them

    Tiles and flooring come from one batch and with a margin: buying the exact same shade later is usually impossible.

    Different tile batches differ in shade, and it shows on the wall rather than in the shop.

  16. Photograph wiring and pipes before they are covered

    Shoot with reference points and a tape measure in frame. A year later these photos answer the question of whether you can drill here.

  17. Accept the work against a list, not by eye

    Levels, joints, working sockets and taps, no marks left behind. Record the snags as a list and agree a deadline for fixing them.

  18. Collect documents, warranties and leftover materials

    Appliance manuals, warranties, receipts, leftover tiles and paint for touch-ups. Put them in one place and label it.

  19. Plan the post-renovation clean as its own job

    This is not \u201csweep up at the end\u201d but several passes against construction dust. Budget time and energy for it in advance.

Renovations fail on postponed decisions, not on tiles

The most expensive part of a renovation is not materials but rework. Rework comes from decisions made too late: the socket moved after plastering, the bath chosen after the tiling, the washing machine bought once the recess was already built to different dimensions.

So preparation is mostly about decisions made before the work starts, and about documents fixed at the outset. After that the renovation becomes the execution of a plan rather than a series of improvisations.

What to decide before the first hammer blow

Decision What it determines
Scope of work, room by room The budget, the timeline and where you will live
Furniture and appliance layout Sockets, water outlets, connection heights
Specific models of large appliances Recesses, dimensions and connections — before, not after
Floor and wall finishes The order of works and the screed thickness
Who does the work Timescales, responsibility, payment schedule

A list of appliance models with exact dimensions is the most underrated item here. A recess for a built-in dishwasher built “roughly” leads to buying a different dishwasher.

About money and time

A contingency reserve is always needed, because opened walls and floors reliably deliver surprises: old wiring, uneven slabs, traces of past leaks. Keep the reserve separate from the budget and do not spend it on “while we are at it”.

Fix the timeline in stages rather than as a single completion date. A stage that slips is visible immediately; a single end date keeps lying to you until the final week.

The documents that save you later

A contract with a costed schedule and payment terms. Photographs of the flat before the work. And above all, photographs of concealed work before it is covered: wiring and pipes in walls and floors, shot with recognisable reference points. A year later, when you want to hang a shelf or trace a leak, those photos are worth more than any manual.

Neighbours and building rules

Permitted hours for noisy work, rules for construction waste, lift use, approvals for structural changes — these vary by building and country, and are better learned before you start than after the first complaint. Neighbours who were warned are far more tolerant of unexpected noise.

When preparation is complete

The scope is described, the layout is approved, appliances are chosen with dimensions, the contract is signed, the current state is documented, neighbours are warned, waste removal is arranged, the reserve is set aside and the acceptance stages are scheduled. After that a renovation becomes a project with a plan rather than an endless building site.

Unload

A list you can come back to

Add this checklist to Unload to turn each item into a task. Mark things done, set dates and make the list your own. Remember another errand or have an idea? Capture it by voice or text and return to it in the app.

  1. 1Open the checklist in the app
  2. 2Choose options for your situation
  3. 3Tap Add — done

Frequently asked questions

Where do I start preparing for a renovation?

With the scope and the layout: exactly what is being done, where the furniture and appliances will go and what size they are. Sockets, water outlets and the order of works all follow from that. Materials and contractors are chosen to fit the decision, not the other way round.

What must I photograph during a renovation?

Concealed work before it is covered: wiring and pipes in walls and floors, with reference points and a tape measure in frame. It is the only way to know a year later where you can drill and where a leak comes from.